New York City › contractor
AWL INDUSTRIES INC
59 permits on record in New York City (2025-09-11 → 2026-08-19) · License 000139 · declared value $65,315,949
Rank in New York City
| HVAC & Mechanical | no permits in last 30 days | #75 of 3536 (12 months, 25) |
| General & Remodel | no permits in last 30 days | #372 of 6342 (12 months, 15) |
| Solar & Storage | no permits in last 30 days | #70 of 96 (12 months, 1) |
Permits per month, last 12 months
Recent permits
| Issued | Trade | Address | Work | Status |
|---|---|---|---|---|
| 2026-08-19 | HVAC & Mechanical | 70 EAST 108 STREET MANHATTAN | LEHMAN VILLAGE HOUSES, INSTALLATION OF TEMPBOILER STACKS, STEAM, CONDENSATE, MAKE-UP WATER PIPING CONNECTED TO EXISTING HEATING PLANT TO PRO | Permit Issued ↗ |
| 2026-08-18 | HVAC & Mechanical | 5913 GLENWOOD ROAD BROOKLYN | PROVIDE SUPPLY FAN (THERMOSTATICALLY CONTROLLED) AND DUCT WORK TO BRING IN OUTSIDE AIR FOR PROPER VENTILATION TO THE BOILERS. | Permit Issued ↗ |
| 2026-08-10 | Solar & Storage | 7 WOLCOTT STREET BROOKLYN | Installation of solar panels as per plans filed herewith. No change in use, Egress or Occupancy. | Permit Issued ↗ |
| 2026-08-04 | HVAC & Mechanical | 515 4 AVENUE BROOKLYN | ADD MECHANICAL EXHAUST FOR ROOM 306 ART CLASSROOM AND ROOM 305 MULTI-MEDIA LIBRARY. | Permit Issued ↗ |
| 2026-07-30 | HVAC & Mechanical | 1980 LEXINGTON AVENUE MANHATTAN | REMOVE AND REPLACE TWO STEAM BOILERS WITH TWO HOT WATER BOILERS IN THE BOILER ROOM. REMOVE AND REPLACE ONE STEAM WATER HEATER WITH FOUR HOT | Permit Issued ↗ |
| 2026-07-30 | General & Remodel | 1980 LEXINGTON AVENUE MANHATTAN | NYCHA BOILER: New penetrations for exhaust flue and air intake at wall of boiler room, Remove existing combustion air louvers and replace wi | Permit Issued ↗ |
| 2026-07-30 | General & Remodel | 1980 LEXINGTON AVENUE MANHATTAN | NYCHA BOILER: New penetrations for exhaust flue and air intake at wall of boiler room, Remove existing combustion air louvers and replace wi | Permit Issued ↗ |
| 2026-07-21 | General & Remodel | 70 EAST 108 STREET MANHATTAN | LEHMAN VILLAGE BOILER UPGRADES, ARCHITECTURAL MODIFICATIONS AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY. | Permit Issued ↗ |
| 2026-06-18 | General & Remodel | 9820 SEAVIEW AVENUE BROOKLYN | Addition of 2 story mechanical/boiler enclosure. | Permit Issued ↗ |
| 2026-06-18 | HVAC & Mechanical | 1 CENTRE STREET MANHATTAN | The intent of this project is to replace (8) existing steam pressure reducing valves and associated piping. Upgrade existing controls with ( | Permit Issued ↗ |
| 2026-06-17 | HVAC & Mechanical | 345 VAN SICKLEN STREET BROOKLYN | PS 095K, INSTALLATION OF TEMPORARY CHIMNEY, STEAM, CONDENSATE, AND MAKE-UP WATER PIPING TO CONNECT TEMPORARY MOBILE BOILER DURING RENOVATION | Permit Issued ↗ |
| 2026-06-17 | HVAC & Mechanical | 185 FIRST AVENUE MANHATTAN | PS 019M, INSTALLATION OF TEMPORARY CHIMNEY, STEAM, CONDENSATE, AND MAKE-UP WATER PIPING TO CONNECT TEMPORARY MOBILE BOILER DURING RENOVATION | Permit Issued ↗ |
| 2026-06-15 | HVAC & Mechanical | 4801 AVENUE D BROOKLYN | Replace exisiting Fan belt drives with new motors,remove and replace existing exhaust fan EF-5T completely, refurbish existing unit ventilat | Permit Issued ↗ |
| 2026-06-15 | General & Remodel | 4801 AVENUE D BROOKLYN | install new fire rated shaft partitions | Permit Issued ↗ |
| 2026-06-15 | General & Remodel | 5800 20 AVENUE BROOKLYN | K505_ New School Based Health Clinic (SBHC)_ work to include: removal of interior non-loadbearing partitions, finishes millwork, doors & fin | Permit Issued ↗ |
| 2026-06-15 | HVAC & Mechanical | 5800 20 AVENUE BROOKLYN | REMOVE AND PROVIDE NEW VENTILATION SYSYTEM AND PROVIDE NEW DUCTLESS MINI SPLIT AC UNITS. PROVIDE NEW LIGHTS AND LIGHTING CONTROLS. | Permit Issued ↗ |
| 2026-06-15 | HVAC & Mechanical | 411 PEARL STREET MANHATTAN | M520/Mechanical work related to COVID Ventilation project | Permit Issued ↗ |
| 2026-06-15 | General & Remodel | 411 PEARL STREET MANHATTAN | M520/ General Construction work related to COVID Ventilation project | Permit Issued ↗ |
| 2026-03-27 | HVAC & Mechanical | 120 55 QUEENS BOULEVARD QUEENS | Installation of new RTU, ACCU, associated ducts, piping and equipment as per plans. No change in use, egress or occupancy. | Permit Issued ↗ |
| 2026-03-13 | HVAC & Mechanical | 1 CENTRE STREET MANHATTAN | HVAC WORK AS SHOWN ON PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGREES, OR OCCUPANCY AS OF RIGHT. | Signed-off ↗ |
| 2026-03-06 | General & Remodel | 803 FORBELL STREET BROOKLYN | INSTALLATION OF PREFABRICATED MODULAR STRUCTURE (FIELD OFFICE), WITH EXTERIOR STEPS AND ADA RAMP WITHIN THE PROPERTY LINE AS PER PLANS. | Permit Issued ↗ |
| 2026-02-25 | HVAC & Mechanical | 400 EAST 105 STREET MANHATTAN | NYCHA EAST RIVER BOILERS CONSISTING OF MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | Permit Issued ↗ |
| 2026-02-17 | General & Remodel | 2055 MAPES AVENUE BRONX | Removal existing one(1) pneumatic thermostat, associated tubing, new steam traps, valves piping and controls, install (1) new VRF/ACCU-Unit, | Permit Issued ↗ |
| 2026-02-12 | HVAC & Mechanical | 25 BRIGHTON 4 ROAD BROOKLYN | CTF - INTERIOR RENOVATION & UPGRADES TO EXIST. CONSTRUCTION TRADE SHOPS (ELECT RM. IN CEL FLOOR & ROOMS 101 & 125). INSTALL SPLIT SYSTEM AC | Permit Issued ↗ |
| 2026-02-11 | HVAC & Mechanical | 70 EAST 108 STREET MANHATTAN | LEHMAN BOILER UPGRADE, MECHANICAL MODIFICATIONS FOR SAID SCOPE AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY. | Permit Issued ↗ |