149 permits on record in Mesa (2025-09-04 → 2026-10-19) · License 326134 B · declared value $1,948,400

Rank in Mesa

Electrical#1 of 4 (30 days, 2 permits)#1 of 42 (12 months, 125)

Permits per month, last 12 months

10
11
12
01
02
03
04
05
07
08
09
10

Recent permits

IssuedTradeAddressWorkStatus
2026-10-19Electrical1343 E ELLIS CIRPERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WIssued ↗
2026-09-28Electrical2911 S MOLLERAPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTC of C Issued ↗
2026-09-22Electrical1123 S VEGASPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL C of C Issued ↗
2026-09-03Electrical9436 E LOMPOC AVEPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTC of C Issued ↗
2026-08-25Electrical8305 E KIOWA AVEPERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA Issued ↗
2026-08-21Electrical4550 E ENCANTO STPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRC of C Issued ↗
2026-08-21Electrical6217 S CLANCYPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRC of C Issued ↗
2026-08-18Electrical9534 E RIPPLE DRPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRIssued ↗
2026-08-10Electrical4031 N OLYMPIC CIRPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTC of C Issued ↗
2026-08-10Electrical7560 E SNOWDON STPERMIT IS ONLY FOR INSTALLATION OF TWO TESLA POWERWALL 3 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUC of C Issued ↗
2026-08-06Electrical11508 E MEDINA AVEPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRC of C Issued ↗
2026-08-06Electrical10251 E SUPERNOVA DRPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRC of C Issued ↗
2026-08-06Electrical9948 E REVOLUTION DRPERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WC of C Issued ↗
2026-08-06Electrical7411 E DRUMMER AVEPERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WC of C Issued ↗
2026-08-05Electrical4461 E DELTA AVEPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL C of C Issued ↗
2026-08-04Electrical106 N FLINT CIRPERMIT IS ONLY FOR THE INSTALLATION OF ONE SOLAREDGE HOME BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCC of C Issued ↗
2026-08-04Electrical9022 E KENWOOD STPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRC of C Issued ↗
2026-07-27Electrical4130 E ALDER AVEPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRC of C Issued ↗
2026-07-22Electrical7166 E PAMPA AVEPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRC of C Issued ↗
2026-07-16Electrical9825 E SUNSPOT DRPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL C of C Issued ↗
2026-07-15Electrical9649 E RAINBOW AVEPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTC of C Issued ↗
2026-07-15Electrical1126 W MADERO AVEPERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES AND ONE EXPANSION PACK. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITHC of C Issued ↗
2026-07-14Electrical9740 E SPIRAL AVEPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTC of C Issued ↗
2026-07-13Electrical1446 E HARMONY AVEPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRC of C Issued ↗
2026-05-20Electrical5825 E EVERGREEN STPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRC of C Issued ↗