Chicago › contractor

CURRENT COMMUNICATIONS CORP.

103 permits on record in Chicago (2025-09-04 → 2026-10-21) · declared value $40,618,748

Rank in Chicago

Electrical#7 of 227 (30 days, 7 permits)#4 of 769 (12 months, 89)

Permits per month, last 12 months

11
12
01
02
03
04
05
06
07
08
09
10

Recent permits

IssuedTradeAddressWorkStatus
2026-10-21Electrical20 S CLARK STSELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO AN EXISTING OFFICE BUILDING ON THE 22ND FLOOR, SPEC OFFICE SUITE 2250. WORK INCLUDES NEW PARTIT ↗
2026-10-21Electrical20 S CLARK STSELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO AN EXISTING OFFICE BUILDING ON THE 24TH FLOOR, SPEC OFFICE SUITE 2400. WORK INCLUDES NEW PARTIT ↗
2026-10-21Electrical20 S CLARK STSELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO AN EXISTING OFFICE BUILDING ON THE 26TH FLOOR, SPEC OFFICE SUITE 2620. WORK INCLUDES NEW PARTIT ↗
2026-10-21Electrical20 S CLARK STSELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO AN EXISTING OFFICE BUILDING ON THE 28TH FLOOR, SPEC OFFICE SUITE 2800. WORK INCLUDES NEW PARTIT ↗
2026-10-05Electrical353 N CLARK STSELFCERT 2019 CBRC: INTERIOR DEMO ONLY TO EXISTING 23RD FLOOR OFFICE SPACE - SUITE 2300. NO CHANGE TO EXISTING USE. (BUSINESS / 1A) ↗
2026-10-02Electrical150 N WACKER DRSELF CERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING 20TH FLOOR OFFICE SPACE - SUITE 2020. WORK TO INCLUDE NEW NON LOAD BEARING PARTITIONS, ↗
2026-09-28Electrical525 W VAN BUREN STSELFCERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING 16TH FLOOR OFFICE SPACE. NO CHANGE TO EXISTING USE. (BUSINESS / 1A) ↗
2026-09-24Electrical353 N CLARK STSELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING 5TH FLOOR OFFICE SPEC SUITES 500A, 500B, AND 500C AS PER PLANS. WORK INCLUDES SELECTIV ↗
2026-09-21Electrical525 W VAN BUREN STSELFCERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING 10TH FLOOR OFFICE SPACE. NO CHANGE TO EXISTING USE. (BUSINESS / 1A) ↗
2026-09-15Electrical405 W SUPERIOR STSELF-CERTIFICATION PROJECT - 2019 CHICAGO BUILDING REHABILITATION CODE:THE INTERIOR ALTERATIONS TO THE EXISTING 2ND FLOOR OFFICE SPACE, IN A ↗
2026-09-15Electrical405 W SUPERIOR STSELF-CERT - 2019 CBRC:THE INTERIOR ALTERATIONS TO THE EXISTING 4TH FLOOR OFFICE SPACE, IN AN EXISTING 7 STORY COMMERCIAL OFFICE BUILDING. GR ↗
2026-09-14Electrical155 N CARPENTER STSELF-CERT 2019 CBRC: INITIAL BUILDOUT OF OFFICE SUITE 200. NO EXTERIOR WORK. NO STRUCTURAL WORK. NO WORK TO EGRESS SYSTEM. (OCCUPANCY GROUP ↗
2026-09-08Electrical200 S WACKER DRSELFCERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING 9TH FLOOR OFFICE SPACE - SUITE 950. NO CHANGE TO EXISTING USE. (BUSINESS / 1A) ↗
2026-09-03Electrical353 N CLARK STSELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING 18TH FLOOR OFFICE SUITE 1810 AS PER PLANS. WORK INCLUDES SELECTIVE DEMOLITION, NEW NON ↗
2026-09-03Electrical353 N CLARK STSELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING 20TH FLOOR OFFICE SUITE 2000 AS PER PLANS. WORK INCLUDES SELECTIVE DEMOLITION, NEW NON ↗
2026-09-02Electrical33 N DEARBORN STSELF-CERT 2019 CBRC: ALTERATIONS OF EXISTING OFFICE SUITES 600 AND 650. TWO EXISTING OFFICE SUITES TO BE COMBINED INTO ONE OFFICE SUITE. INT ↗
2026-09-02Electrical1 E WACKER DRSELF-CERT 2019 CBRC - TENANT BUILDOUT OF 3,283 SQFT FOR BUSINESS OFFICE ON THE 33RD FLOOR, INCLUDING ALTERATIONS TO ELECTRICAL CIRCUITS, MEC ↗
2026-08-28Electrical1 E WACKER DRSELF-CERT 2019 CBRC: INTERIOR ALTERATIONS OF EXISTING OFFICE SUITE 800 (OCCUPANCY GROUP B-BUSINESS; CONSTRUCTION TYPE 1A) ↗
2026-08-25Electrical30 N LA SALLE STSELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO AN EXISTING OFFICE SUITE 2400 AS PER PLANS. WORK TO INCLUDE DEMOLITION, NEW PARTITIONS, DOORS A ↗
2026-08-25Electrical1143 S DELANO CT ESELF-CERT 2019 CBRC: INTERIOR ALTERATION OF EXISTING 4,100 SF TENANT SPACE IN EXISTING 8 STORY MIXED OCCUPANCY BRICK AND GRASS BUILDING (OCC ↗
2026-08-21Electrical120 S RIVERSIDE PLZSELFCERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING 21ST FLOOR OFFICE SPACE. SCOPE TO INCLUDE NEW FINISHES, MILLWORK, LIGHTING, AND CEILING ↗
2026-08-21Electrical1 N FRANKLIN STSELF CERT 2019 CBRC: INTERIOR RENOVATION OF 16TH AND 33RD FLOOR OFFICE SPACE. WORK ON THE 16TH FLOOR TO INCLUDE FULL RENOVATION OF FLOOR INC ↗
2026-08-21Electrical1 N FRANKLIN STSELF CERT 2019 CBRC: INTERIOR ALTERATIONS TO PARTIAL 20TH FLOOR OFFICE SPACE. WORK TO INCLUDE DEMOLITION OF NON-LOAD BEARING PARTITIONS, CEI ↗
2026-08-21Electrical1 N FRANKLIN STSELF CERT 2019 CBRC: PARTIAL INTERIOR RENOVATION OF THE 20TH FLOOR ELEVATOR LOBBY AND CORE TOILET ROOMS. WORK TO INCLUDE DEMOLITION AND CONS ↗
2026-08-21Electrical1 N FRANKLIN STSELF CERT 2019 CBRC: PARTIAL INTERIOR RENOVATION OF THE 33RD FLOOR ELEVATOR LOBBY AND CORE TOILET ROOMS. WORK TO INCLUDE DEMOLITION AND CONS ↗