Austin › contractor
Torres Plumbing
58 permits on record in Austin (2025-09-12 → 2026-10-20)
Rank in Austin
| Plumbing | #87 of 267 (30 days, 2 permits) | #48 of 959 (12 months, 53) |
Permits per month, last 12 months
Recent permits
| Issued | Trade | Address | Work | Status |
|---|---|---|---|---|
| 2026-10-20 | Plumbing | 4302 TWISTED TREE DR | Garage conversion/Interior remodel convert garage into conditioned space to create bedroom. Structural interior remodel of existing 2-story | Active ↗ |
| 2026-10-20 | Plumbing | 915 HERMITAGE DR | Express: Replace existing shower with new shower in master bedroom. Replace bathroom window. Like for like | Active ↗ |
| 2026-09-20 | Plumbing | 2947 ECKERT ST | Interior Remodel - Changing internal walls per architectural plan running new electrical plumbing and HVAC. Replacing sidings windows remode | Active ↗ |
| 2026-09-08 | Plumbing | 6504 SANDSHOF DR | Replacement of an existing water heater | Final ↗ |
| 2026-09-02 | Plumbing | 6418 SOUTH MEADOWS BLVD | Express: Tub to shower conversion; replace existing water heater | Final ↗ |
| 2026-08-31 | Plumbing | 12628 LA PAZ LN | Express- tub to shower conversion | Final ↗ |
| 2026-08-20 | Plumbing | 6507 CAPRIOLA DR | Express: Tub to shower conversion | Final ↗ |
| 2026-08-12 | Plumbing | 909 W 18TH ST | Interior Remodel- Demo of level one interior space. Reconfiguration of level 1 floorplan with new walls cabinetry and finishes. Replacement | Active ↗ |
| 2026-08-09 | Plumbing | 9107 SLAYTON DR | Express- Tub to shower conversion. Replace 6 windows like for like. | Final ↗ |
| 2026-08-03 | Plumbing | 2010 E 8TH ST | Express: Tub to shower conversion. Replacement of complete existing central and air system with or without duct work replace evaporator coil | Final ↗ |
| 2026-07-29 | Plumbing | 2068 S LAMAR BLVD UNIT 200 | Change of Use and finish out for small restaurant. | Active ↗ |
| 2026-07-23 | Plumbing | 2943 THOUSAND OAKS DR | interior remodel and major addition to existing two-story single-family residence. Scope includes first-floor addition partial second-floor | Inactive Pending Revision ↗ |
| 2026-07-19 | Plumbing | 8506 ANDREAS CV | *Partial Demo* Interior remodel Full interior remodel. kitchen bath bedroom office | Active ↗ |
| 2026-07-17 | Plumbing | 2010 E 8TH ST | We will be replacing an existing water heater | Final ↗ |
| 2026-07-15 | Plumbing | 2106 POMPTON DR UNIT 2 | Interior Remodel Unit B Kitchen bathroom and bedroom remodel | Active ↗ |
| 2026-07-10 | Plumbing | 508 SOUTH PARK DR | Express: Tub to shower conversion. Replace bathroom window. | Final ↗ |
| 2026-07-02 | Plumbing | 915 HERMITAGE DR | EXPRESS: Tub to shower conversion in hall bath | Final ↗ |
| 2026-06-23 | Plumbing | 5259 MEADOW CREEK DR | Express: Tub to shower conversion | Final ↗ |
| 2026-06-22 | Plumbing | 2121 E OLTORF ST UNIT 17 B | CHANGE OF USE FROM RETAIL TO BILLIARD The project includes electrical and plumbing installations meeting City of Austin codes and Plumbing I | Final ↗ |
| 2026-06-15 | Plumbing | 2326 LAKEHURST DR | Express: Tub to shower conversion | Final ↗ |
| 2026-06-04 | Plumbing | 7008 BECKETT RD | Garage conversion of detached garage- remove garage door install window in its place enclose garage door opening with siding. No structural | Active ↗ |
| 2026-06-01 | Plumbing | 4808 EASTDALE DR | Express- Tub to shower conversion in master bath | Final ↗ |
| 2026-05-26 | Plumbing | 4800 RUE LE FLEUR | Water Heater Replacement | Final ↗ |
| 2026-05-26 | Plumbing | 1513 CLOVERLEAF DR | Excavate a tunnel beneath the residence to access and replace existing cast iron piping with new PVC piping in accordance with local plumbin | Active ↗ |
| 2026-05-21 | Plumbing | 6508 ORANGE BLOSSOM WAY | Replacement of an existing water heater | Final ↗ |