Austin › contractor
Peanut Plumbing LLC
76 permits on record in Austin (2025-09-05 → 2026-10-22)
Rank in Austin
| Plumbing | #30 of 267 (30 days, 6 permits) | #39 of 959 (12 months, 66) |
Permits per month, last 12 months
Recent permits
| Issued | Trade | Address | Work | Status |
|---|---|---|---|---|
| 2026-10-22 | Plumbing | 3005 CARLISLE DR | Tunnel under the foundation to replace the cast iron drain lines in the bathroom Kitchen and laundry with SCH 40 PVC. Two access holes will | Active ↗ |
| 2026-10-15 | Plumbing | 6002 SPANCREEK CIR | Tunnel under the foundation to replace the cast iron drain lines in the bathroom Kitchen and laundry with SCH 40 PVC. Two access holes will | Active ↗ |
| 2026-10-06 | Plumbing | 2402 ELMGLEN DR | Tunnel under the foundation to replace the cast iron drain lines in the bathroom Kitchen and laundry with SCH 40 PVC. There will be two acce | Active ↗ |
| 2026-09-27 | Plumbing | 8210 RENTON DR | Tunnel under the foundation to replace the cast-iron drain lines. There will be two access holes: one in front and one on the side. | Final ↗ |
| 2026-09-27 | Plumbing | 7312 MEADOWOOD DR | Replace gas water heater located in the garage. | Final ↗ |
| 2026-09-27 | Plumbing | 311 E 35TH ST | Replace the sewer yard line with Sch. 40 PVC piping. | Active ↗ |
| 2026-09-20 | Plumbing | 8511 JAMESTOWN DR | Tunnel under the foundation to replace the cast iron drain lines in the bathroom Kitchen and laundry with SCH 40 PVC. Two access holes will | Final ↗ |
| 2026-09-16 | Plumbing | 2600 CASCADE DR | Tunnel under the foundation to replace the cast iron drain lines in the bathroom Kitchen and laundry with SCH 40 PVC. There will be two acce | Final ↗ |
| 2026-09-01 | Plumbing | 5803 SHOAL CREEK BLVD | Tunnel under the foundation to replace the cast iron drain lines. There will be two access holes: one in front and one on the side. | Final ↗ |
| 2026-09-01 | Plumbing | 3109 STANWOOD DR | Tunnel under the foundation to replace the cast iron drain lines in the bathroom Kitchen and laundry with SCH 40 PVC. There will be two acce | Final ↗ |
| 2026-08-26 | Plumbing | 1613 RIDGEMONT DR | Tunnel under the foundation to replace the cast iron drain lines in the bathroom Kitchen and laundry with SCH 40 PVC. There will be two acce | Final ↗ |
| 2026-08-19 | Plumbing | 7925 BURNET RD | Tunnel under the foundation to replace the cast iron drain lines in two bathrooms with SCH 40 PVC. There will be one access hole:right side | Final ↗ |
| 2026-08-11 | Plumbing | 3001 GREENLAWN PKWY | Tunnel under the foundation to replace the cast iron drain lines in the bathroom Kitchen and laundry with SCH 40 PVC. There will be three ac | Final ↗ |
| 2026-08-11 | Plumbing | 9206 INDIAN QUAIL CIR | Tunnel under the foundation to replace the cast iron drain lines in the bathroom Kitchen and laundry with SCH 40 PVC. There will be three ac | Final ↗ |
| 2026-07-24 | Plumbing | 5312 AIRPORT BLVD | Tunnel under the foundation to repair the broken PVC and the cast-iron drain line by using SCH 40 PVC. There will be two access points: one | Final ↗ |
| 2026-07-24 | Plumbing | 5813 GATESHEAD DR | Express: Foundation repair (install 13 total steel pier locations including 10 perimeter and 3 interior locations 3 breakthrough and patched | Final ↗ |
| 2026-07-24 | Plumbing | 5504 CAMP FIRE TRL | Dig the front yard and replace PVC sewer yard line. | Final ↗ |
| 2026-07-13 | Plumbing | 7509 DELAFIELD LN | Tunnel under the foundation to replace the cast iron drain lines in the bathroom Kitchen and laundry with SCH 40 PVC. There will be two acce | Final ↗ |
| 2026-07-13 | Plumbing | 1300 RIDGEMONT DR | Tunnel under the foundation to replace the cast iron drain lines in the bathroom Kitchen and laundry with SCH 40 PVC. There will be three ac | Final ↗ |
| 2026-07-01 | Plumbing | 1903 BURBANK ST | Tunnel under the foundation to replace the cast iron drain lines in the bathroom Kitchen and laundry with SCH 40 PVC. There will be three ac | Final ↗ |
| 2026-06-23 | Plumbing | 5001 GREENHEART DR | Tunnel under the foundation to replace the cast iron drain lines in the bathroom Kitchen and laundry with SCH 40 PVC. There will be three ac | Final ↗ |
| 2026-06-18 | Plumbing | 2011 SUNNY BROOK DR | Tunnel under the foundation to repair a break in the PVC drain line in the master bathroom and hall bathroom with SCH 40 PVC. There will be | Final ↗ |
| 2026-06-05 | Plumbing | 6408 KENILWORTH DR | Excavate 13 tunnel to repair drain/sewer line serving bathroom | Final ↗ |
| 2026-06-03 | Plumbing | 2307 LEHIGH DR | Tunnel under the foundation 10Ft to repair a damaged rubber boot located under the foundation. | Final ↗ |
| 2026-06-03 | Plumbing | 10704 DOERING LN | Tunnel under the foundation to repair a 15-ft PVC drain line with SCH 40 PVC. There will be two access holds in front and the side of the ho | Final ↗ |