Austin › contractor
Nomic Energy LLC DBA Nomic Power Solutions
55 permits on record in Austin (2025-10-20 → 2026-10-20)
Rank in Austin
| Electrical | #23 of 333 (30 days, 8 permits) | #43 of 1218 (12 months, 54) |
Permits per month, last 12 months
Recent permits
| Issued | Trade | Address | Work | Status |
|---|---|---|---|---|
| 2026-10-20 | Electrical | 15104 SUNNINGDALE ST | Disconnect and Reconnect (PEC) - Installation of a 150A Service Rated Automatic Transfer Switch 26kW whole home generator additional groundi | Active ↗ |
| 2026-10-14 | Electrical | 8105 AMELIA CV | Installation of a 200A Service-Rated Automatic Transfer Switch 26kW whole home generator additional grounding and type 2 surge protection | Active ↗ |
| 2026-10-14 | Electrical | 611 HEARN ST | Installation of a 200A Service-Rated Automatic Transfer Switch 22kW whole home generator additional grounding and type 2 surge protection | Active ↗ |
| 2026-10-07 | Electrical | 2420 HARRIS BLVD | Installation of a 200A Service-Rated Automatic Transfer Switch/Load Center 28kW whole home generator additional grounding and type 2 surge p | Withdrawn ↗ |
| 2026-09-30 | Electrical | 1903 CULLEN AVE | Installation of a 200A Service-Rated Automatic Transfer Switch 26kW whole home generator additional grounding and type 2 surge protection | Active ↗ |
| 2026-09-30 | Electrical | 4700 PHILCO DR | Installation of a 200A Service-Rated Automatic Transfer Switch 26kW whole home generator additional grounding and type 2 surge protection | Active ↗ |
| 2026-09-30 | Electrical | 5901 SARATOGA CV | Installation of a 200A Service-Rated Automatic Transfer Switch 26kW whole home generator additional grounding and type 2 surge protection | Active ↗ |
| 2026-09-28 | Electrical | 4401 AMARRA DR BLDG 11 | Disconnect and Reconnect Only - ETJ 26kW whole home generator | Final ↗ |
| 2026-09-22 | Electrical | 10800 SHACKELFORD DR | Disconnect and Reconnect Only - ETJ Installation of a 150A Service-Rated Automatic Transfer Switch 24kW whole home generator additional grou | Active ↗ |
| 2026-09-21 | Electrical | 8212 PHANTOM CANYON DR | Installation of a 200A Service-Rated Automatic Transfer Switch 28kW whole home generator additional grounding and type 2 surge protection | Final ↗ |
| 2026-09-17 | Electrical | 519 CRYSTAL CREEK DR | ETJ-Disconnect and Reconnect required to Install 200A and 150A Service-Rated Automatic Transfer Switches for generator | Final ↗ |
| 2026-09-16 | Electrical | 4900 PERALTA LN | Disconnect and Reconnect Only - ETJ Installation of a 150A Service-Rated Automatic Transfer Switch 14kW whole home generator additional grou | Final ↗ |
| 2026-09-14 | Electrical | 701 W MARY ST | Installation of a 200A Service-Rated Automatic Transfer Switch 18kW whole home generator additional grounding and type 2 surge protection | Final ↗ |
| 2026-09-08 | Electrical | 1600 RANDOLPH RIDGE TRL | Installation of a 200A Service-Rated Automatic Transfer Switch 26kW whole home generator additional grounding and type 2 surge protection | Final ↗ |
| 2026-09-03 | Electrical | 3911 GLENGARRY DR | Installation of a 200A Service-Rated Automatic Transfer Switch 24kW whole home generator additional grounding and type 2 surge protection | Final ↗ |
| 2026-08-28 | Electrical | 3806 HOLT DR | Installation of a 100A Service-Rated Automatic Transfer Switch 18kW whole home generator additional grounding and type 2 surge protection | Final ↗ |
| 2026-08-24 | Electrical | 1617 NORTHWOOD RD | Installation of a 150A and a 200A Service-Rated Automatic Transfer Switch 28kW whole home generator additional grounding and type 2 surge pr | Final ↗ |
| 2026-08-20 | Electrical | 5001 LEA CV | Installation of a 200A Service-Rated Automatic Transfer Switch 22kW whole home generator additional grounding and type 2 surge protection Up | Final ↗ |
| 2026-08-04 | Electrical | 2400 SPANISH CAMP CV | Relocation of Load-Side Tap to Line-Side Tap for existing solar generation system. No other system changes. | Final ↗ |
| 2026-08-04 | Electrical | 4513 AVENUE B UNIT 2 | Installation of a 200A Service-Rated Automatic Transfer Switch 18kW whole home generator additional grounding and type 2 surge protection | Final ↗ |
| 2026-07-28 | Electrical | 3412 MOUNT BARKER DR | Installation of a 200A Service-Rated Automatic Transfer Switch/Load Center Combo 24kW whole home generator additional grounding and type 2 s | Final ↗ |
| 2026-07-22 | Electrical | 6608 WINTERBERRY DR | Installation of a 200A Service-Rated Automatic Transfer Switch 28kW whole home generator additional grounding and type 2 surge protection | Final ↗ |
| 2026-07-13 | Electrical | 1901 CULLEN AVE | Installation of a 200A Service-Rated Automatic Transfer Switch 24kW whole home generator additional grounding and type 2 surge protection | Final ↗ |
| 2026-07-10 | Electrical | 1204 KINNEY AVE | Installation of a 200A Service-Rated Automatic Transfer Switch 24kW whole home generator additional grounding and type 2 surge protection | Final ↗ |
| 2026-07-02 | Electrical | 6508 WEST COURTYARD DR | Installation of a 200A Service-Rated Automatic Transfer Switch 26kW whole home generator additional grounding and type 2 surge protection | Final ↗ |