Austin › contractor
Malco Electric
39 permits on record in Austin (2025-09-08 → 2026-10-22)
Rank in Austin
| Electrical | #41 of 333 (30 days, 5 permits) | #89 of 1218 (12 months, 33) |
Permits per month, last 12 months
Recent permits
| Issued | Trade | Address | Work | Status |
|---|---|---|---|---|
| 2026-10-22 | Electrical | 2700 S LAMAR BLVD | Upgrade of existing service to relocate outside of enclosed area per Ryan Mabin ***relocating existing service to get it out of the building | Active ↗ |
| 2026-10-15 | Electrical | 500 BLUE VALLEY DR | Service upgrade of existing125amp underground service to new 200amp | Active ↗ |
| 2026-10-13 | Electrical | 4619 HERZOG ST | 60amp circuit for EV Charging Station Hardwired | Active ↗ |
| 2026-09-29 | Electrical | 7605 PARKVIEW CIR | Upgrade 200amp underground service to new 225amp | Active ↗ |
| 2026-09-29 | Electrical | 7904 CROFTWOOD DR | Emergency Service repair and upgrade from 120amp underground with burned up Zinsco Panel to new 200 amp | Final ↗ |
| 2026-09-21 | Electrical | 408 PALOS VERDES DR | Emergency upgrade of existing 200amp underground service with new panel and meter LIKE FOR LIKE | Final ↗ |
| 2026-09-10 | Electrical | 11506 CHARRED OAK DR | Service upgrade of existing 125amp underground to a new 200amp. Installation of a 60amp EV Charging Station | Final ↗ |
| 2026-08-28 | Electrical | 3006 NORWOOD HILL RD | Service upgrade of 125amp overhead with cloth riser to 200amp | Active ↗ |
| 2026-08-27 | Electrical | 1409 LAVACA ST | Install mini split system. | Active ↗ |
| 2026-08-18 | Electrical | 2600 CASCADE DR | Service upgrade of existing 125amp with cloth riser to new 200amp overhead | Active ↗ |
| 2026-08-18 | Electrical | 5503 WOODROW AVE | Service upgrade of 150amp overhead with failing equipment to a new 200amp | Final ↗ |
| 2026-08-07 | Electrical | 12011 SHADY SPRINGS RD | Service upgrade of 125amp underground to new 200amp. Installation of 60amp circuit for new EV Charging Station | Final ↗ |
| 2026-07-27 | Electrical | 2604 W 8TH ST BLDG B | Installation of 60amp circuit for a 48amp EV Charging Station | Final ↗ |
| 2026-07-22 | Electrical | 8704 CAMELIA LN | Emergency Service Repair with damaged riser wires and antiquated equipment. Work was completed on 7-17-2026 | Final ↗ |
| 2026-07-16 | Electrical | 4902 AVENUE F | Installation of 60amp circuit for EV Charging Station | Final ↗ |
| 2026-07-15 | Electrical | 8311 HANBRIDGE LN | Upgrade 125amp underground service to new 200amp | Final ↗ |
| 2026-07-10 | Electrical | 3505 VILLA CT BLDG 7 | Installation of 60amp circuit for a 48amp hardwired EV Charger | Final ↗ |
| 2026-06-24 | Electrical | 14424 BALLYCASTLE TRL | Installation of 60amp EV Charger | Final ↗ |
| 2026-06-24 | Electrical | 1925 GASTON PLACE DR | Emergency Repair of damaged disconnect ONLY per Hyatt Dunn | Final ↗ |
| 2026-06-17 | Electrical | 11508 BITTERN HOLW | Service upgrade from existing 125amp to new 225amp underground | Final ↗ |
| 2026-06-11 | Electrical | 2000 E 9TH ST | Emergency Service Repair. AE disconnected service due to riser wires burned up at weather head. Service had to be brought up to code. | Final ↗ |
| 2026-06-03 | Electrical | 3305 SUSQUEHANNA LN | Emergency repair and upgrade of 125amp overhead service to new 200amp. Service had a cloth riser that burned up and AE disconnected the serv | Final ↗ |
| 2026-05-09 | Electrical | 1817 MADISON AVE | Service Upgrade of existing 125amp overhead to new 200amp | Final ↗ |
| 2026-05-06 | Electrical | 7620 SCENIC BROOK DR | Upgrade of existing 100amp underground service to new 200amp | Final ↗ |
| 2026-04-29 | Electrical | 7521 MEADOWVIEW LN | Installation of EV Charging Station | Final ↗ |