Austin › contractor
CMM Plumbing LLC
45 permits on record in Austin (2025-09-22 → 2026-10-19)
Rank in Austin
| Plumbing | #26 of 267 (30 days, 7 permits) | #62 of 959 (12 months, 41) |
Permits per month, last 12 months
Recent permits
| Issued | Trade | Address | Work | Status |
|---|---|---|---|---|
| 2026-10-19 | Plumbing | 3002 SKYLARK DR | Addition/Remodel- IR to convert existing bedroom to primary bedroom with ensuite BR and walk-in closet. Remove the existing noncompliant car | Active ↗ |
| 2026-10-12 | Plumbing | 9803 RIBELIN RANCH CT BLDG 23 | New construction of single building based on Volume Builder Approved (2024-067871 VB) Plan 2-AA-R. This is a 2 Story building with height of | Active ↗ |
| 2026-10-12 | Plumbing | 9803 RIBELIN RANCH CT BLDG 27 | New construction of single building based on Volume Builder Approved (2024-067871 VB) Plan 4-AB-R. This is a 2 Story building with height of | Active ↗ |
| 2026-10-12 | Plumbing | 9803 RIBELIN RANCH CT BLDG 31 | New construction of single building based on Volume Builder Approved (2024-067871 VB) Plan 4-AB-R. This is a 2 Story building 4 beds 4.5 bat | Active ↗ |
| 2026-10-12 | Plumbing | 9803 RIBELIN RANCH CT BLDG 29 | New construction of single building based on Volume Builder Approved (2024-067871 VB 2025-097666 PR) Plan 14-EB-R. This is a 2 Story buildin | Active ↗ |
| 2026-10-12 | Plumbing | 9803 RIBELIN RANCH CT BLDG 8 | New construction of single building based on Volume Builder Approved (2024-067871 VB) Plan 6-BA-R. This is a 2 Story building with height of | Active ↗ |
| 2026-10-01 | Plumbing | 11504 TIBEE DR | Replacement of an existing water heater change out of two 50gal gas water heaters with two 40gal gas water heaters in attic | Final ↗ |
| 2026-09-23 | Plumbing | 7201 WOOD HOLLOW DR | EMERGENCY PERMIT: aparment complex has no hot water we need to replace one boiler ASAP | Active ↗ |
| 2026-09-16 | Plumbing | 5100 AVENUE F | Addition/Remodel- SFR remodel 2 story addition to create new kitchen rear covered porch addition and second floor addition 1 bed 1 bath. Exi | Active ↗ |
| 2026-08-20 | Plumbing | 3825 LAKE AUSTIN BLVD | Life and safety issue - repair gas leak | Active ↗ |
| 2026-08-19 | Plumbing | 9803 RIBELIN RANCH CT BLDG 3 | New construction of single building based on Volume Builder Approved (2024-067871 VB) Plan 9-CB-L. This is a 2 Story building with height of | Active ↗ |
| 2026-07-27 | Plumbing | 9803 RIBELIN RANCH CT BLDG 33 | New construction of single building based on Volume Builder Approved (2024-067871 VB) Plan 12-DB-R. This is a 3 Story building with height o | Active ↗ |
| 2026-07-09 | Plumbing | 9803 RIBELIN RANCH CT BLDG 25 | New construction of single building based on Volume Builder Approved (2024-067871 VB 2025-097666 PR) Plan 14-EB-R. This is a 2 Story buildin | Active ↗ |
| 2026-07-09 | Plumbing | 9803 RIBELIN RANCH CT BLDG 16 | New construction of single building based on Volume Builder Approved (2024-067871 VB 2025-097666 PR) Plan 15-EA-L. This is a 2 Story buildin | Active ↗ |
| 2026-07-01 | Plumbing | 9803 RIBELIN RANCH CT BLDG 15 | Plumbing needed for future generator | Active ↗ |
| 2026-06-05 | Plumbing | 7405 FILBERT CV | excavation of an access area at the front of the home along with tunneling approximately 28 feet beneath the porch and home to expose the da | Final ↗ |
| 2026-04-27 | Plumbing | 8500 MILLWAY DR | LIFE SAFETY- Unable to use bathrooms due to broken cast iron will need to redo PVC under slab. | Final ↗ |
| 2026-04-13 | Plumbing | 1202 MARCY ST BLDG 1A | ePlan: Residential Expedited Review - Change of Use to THREE UNIT RES. *Partial Demo* Addition and Remodel to Existing Single Family Res. Wo | Active ↗ |
| 2026-04-13 | Plumbing | 1202 MARCY ST BLDG 1B | ePlan: Residential Expedited Review - Change of Use to THREE UNIT RES. *Partial Demo* Addition and Remodel to Existing Single Family Res. Wo | Active ↗ |
| 2026-04-13 | Plumbing | 1202 MARCY ST BLDG 2 | ePlan: Residential Expedited Review - THREE UNIT RES. Bldg 2 New construction of a 3-Story Single Family Res. [1bed 1.5bath] with Attached G | Active ↗ |
| 2026-04-13 | Plumbing | 1204 MARCY ST BLDG 1B | ePlan: Residential Expedited Review - ePlan: Residential Expedited Review - New construction of a 3-Story Duplex [3bed 3.5bath] with attache | Active ↗ |
| 2026-04-13 | Plumbing | 1204 MARCY ST BLDG 2 | ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [1bed 1.5bath] with attached Garage. Bldg 2 | Active ↗ |
| 2026-04-10 | Plumbing | 1032 SPRINGDALE RD UNIT 101 | New construction of a three-story townhouse with attached garage and balcony. Note: expiration date extended to Dec. 31 2021 in compliance w | Active ↗ |
| 2026-04-10 | Plumbing | 1032 SPRINGDALE RD UNIT 102 | New construction of a three-story townhouse with attached garage and balcony. Note: expiration date extended to Dec. 31 2021 in compliance w | Active ↗ |
| 2026-04-10 | Plumbing | 1032 SPRINGDALE RD UNIT 103 | New construction of a three-story townhouse with attached garage and balcony. Note: expiration date extended to Dec. 31 2021 in compliance w | Active ↗ |