Austin › contractor

Chavez Electric

59 permits on record in Austin (2025-10-21 → 2026-10-23)

Rank in Austin

Electrical#13 of 333 (30 days, 14 permits)#38 of 1218 (12 months, 57)

Permits per month, last 12 months

11
02
03
05
06
07
08
09
10

Recent permits

IssuedTradeAddressWorkStatus
2026-10-23Electrical7008 HEWERS DRservice upgrade from 100 amps to 200 ampsActive ↗
2026-10-22Electrical703 OAKLAND AVE BLDG AAddition/remodel. Addition to rear of existing 2-story duplex to consist of adding 1 bedroom 1 bathroom dining/living room screened balconieActive ↗
2026-10-22Electrical703 OAKLAND AVE BLDG BAddition/remodel. Addition to rear of existing 2-story duplex to consist of adding 1 bedroom 1 bathroom dining/living room screened balconieActive ↗
2026-10-20Electrical1815 MILES AVE2 story 3 bed 2.5 bath with attached garage covered front porch and rear covered patioActive ↗
2026-10-20Electrical6601 CANNONLEAGUE DR2 story 3 bed 2.5 bath with attached garage covered front porch and rear covered patioActive ↗
2026-10-20Electrical6603 CANNONLEAGUE DR2 story 3 bed 2.5 bath with attached garage covered front porch and rear covered patioActive ↗
2026-10-20Electrical98 SAN JACINTO BLVD UNIT FSR903INTERIOR REMODEL OF EXISTING CONDOActive ↗
2026-10-14Electrical6608 CUESTA TRLInterior remodel interior remodel of kitchen and laundry eliminate 1 exterior window in kitchen area there are some interior non load bearinActive ↗
2026-10-12Electrical1815 MILES AVETEMPORARY POLE FOR CONSTRUCTION SITE 2026-113447 BPFinal ↗
2026-10-07Electrical1204 SINGLETON AVEpermit for Meter rack for 3-meter in 1 metal rack service for 1204 Singleton ave units 12 and 3 - related to permit # 2025-137191 EPFinal ↗
2026-09-30Electrical4202 DEEPWOODS DRInterior remodel of SFRActive ↗
2026-09-27Electrical2811 E 22ND ST BLDG 1Bldg. 1 - New construction of 3 story SFR w/ attached carport covered front porch and uncovered wood steps at rear and rooftop uncovered balActive ↗
2026-09-27Electrical2811 E 22ND ST BLDG 2Bldg. 2 - New construction of 3 story SFR w/ attached carport covered front porch and uncovered wood steps at rear and rooftop uncovered balActive ↗
2026-09-27Electrical2811 E 22ND ST BLDG 3Bldg. 3 - New construction of 3 story SFR w/ attached carport covered front porch and uncovered wood steps at rear and rooftop uncovered balActive ↗
2026-09-10Electrical4231 WESTLAKE DR BLDG A UNIT 2MAIN BATHROOM REMODEL NEW NON LOAD BEARING PARTITION WALLS IN LIVING ROOM AND MAIN BATHROOM. NEW DOOR WITH HEADER IN MAIN BEDROOM NEW DOOR WActive ↗
2026-08-31Electrical7706 ROBALO RDInstall (1) 200 AMP meter can and (1) 200AMP load center.Final ↗
2026-08-31Electrical2811 E 22ND STTEMPORARY ELECTRICAL POLE FOR CONSTRUCTION SITE Ref 2026-102503 BPFinal ↗
2026-08-20Electrical1204 SINGLETON AVE BLDG 1New 2-story 3 bedroom 2.5 bathroom dwelling unit with covered porches and uncovered wood deck walkway.Final ↗
2026-08-20Electrical1204 SINGLETON AVE BLDG 2New 2-story 3 bedroom 2.5 bathroom dwelling unit with covered porches and uncovered wood deck walkway.Final ↗
2026-08-20Electrical1204 SINGLETON AVE BLDG 3New 2-story 3 bedroom 2.5 bathroom dwelling unit with covered porches and uncovered wood deck walkway.Final ↗
2026-08-06Electrical5409 BLUE BIRD LN BLDG 15409 Blue Bird Lane Bldg. 1. New 2-story 3 bedroom 3 bathroom dwelling unit with attached garage covered front porch and rear covered patio.Active ↗
2026-08-06Electrical5405 BLUE BIRD LN5405 Blue Bird Lane. New 2-story 3 bedroom 3 bathroom dwelling unit with attached garage covered front porch and rear covered patio.Active ↗
2026-08-06Electrical207 W MOCKINGBIRD LN207 W. Mockingbird Lane. New 2-story 3 bedroom 3 bathroom dwelling unit with attached garage covered front porch and side covered patio.Active ↗
2026-07-24Electrical11307 YUCCA DRpermit for poolFinal ↗
2026-07-13Electrical10604 MARBURY CTRemodel kitchen pantry and utility closet. Replace kitchen window. Pantry relocated to utility closet splitting existing pantry into coffee Active ↗