Austin › contractor
Capital City Plumbing and Drain
27 permits on record in Austin (2025-09-23 → 2026-10-23)
Rank in Austin
| Plumbing | #37 of 267 (30 days, 5 permits) | #112 of 959 (12 months, 22) |
Permits per month, last 12 months
Recent permits
| Issued | Trade | Address | Work | Status |
|---|---|---|---|---|
| 2026-10-23 | Plumbing | 4806 CASWELL AVE | New Pool to replace existing pool | Active ↗ |
| 2026-10-22 | Plumbing | 619 AMESBURY LN | Sewer yard line repair. Roughly 10 feet | Active ↗ |
| 2026-10-19 | Plumbing | 2806 PECOS ST UNIT B | Two-Unit use: New construction studio space with attached 3-car garage and full bath. | Active ↗ |
| 2026-10-15 | Plumbing | 1103 NORWALK LN | Gas test and water main replacement roughly 15 feet | Active ↗ |
| 2026-10-06 | Plumbing | 1905 DAVID ST | Gas test | Final ↗ |
| 2026-08-24 | Plumbing | 2707 S IH 35 SVRD NB | Tunnel roughly 40 feet to repair sewer line | Final ↗ |
| 2026-07-28 | Plumbing | 4104 TABLEROCK DR | Sewer yard line replacement | Final ↗ |
| 2026-05-13 | Plumbing | 11901 SWEARINGEN DR BLDG F UNIT 31 | Repair sewer yard line Details: CCP will excavate to expose the existing sewer line remove and replace the 4-inch cleanout and install appro | Final ↗ |
| 2026-05-06 | Plumbing | 5207 VALLEY OAK DR | 15 sewer yard line and spot repair at ADU | Final ↗ |
| 2026-04-27 | Plumbing | 8408 SISKIN CV | Water yard line and roughly 15 foot tunnel to make repairs | Final ↗ |
| 2026-04-07 | Plumbing | 602 PARK BLVD | Addition/remodel. Addition of a den wood deck landing/steps and expanded primary bedroom to rear of existing noncomplying 1-story single fam | Final ↗ |
| 2026-04-07 | Plumbing | 2104 WOODMONT AVE | New pool 400 sf and spa 48 sf and patio deck (concrete) | Final ↗ |
| 2026-03-04 | Plumbing | 1200 ROMERIA DR | Gas test | Final ↗ |
| 2026-02-23 | Plumbing | 6605 QUINTON DR | Tunnel under the house roughly 10 feet and replace section of the main drain line that had a belly. | Final ↗ |
| 2026-02-19 | Plumbing | 932 E 53RD HALF ST | Gas test | Final ↗ |
| 2026-01-15 | Plumbing | 12227 TANGLEWILD DR | Excavate main sewer line starting 6 from the city cleanout location then follow the sewer line for 65. | Final ↗ |
| 2026-01-13 | Plumbing | 708 KEASBEY ST | Gas test | Final ↗ |
| 2026-01-05 | Plumbing | 5209 DELORES AVE | Replace fitting and replace flex with hard pips for kitchen Install flare fitting and connect gas flex line. Repair gas leak from nail hole | Final ↗ |
| 2025-11-17 | Plumbing | 1116 REAGAN TER | Replace sewer yard line. Main sewer line starting roughly 6 feet in front of the backyard clean out going 75 to 80 feet all the way to the c | Final ↗ |
| 2025-11-09 | Plumbing | 1702 SHELBOURNE DR | Whole house tunnel and sewer yard line replacement | Final ↗ |
| 2025-11-04 | Plumbing | 2209 S 3RD ST | Replace water yard line | Final ↗ |
| 2025-11-04 | Plumbing | 1403 MARCUS PL UNIT 2 | Replace water yard line | Final ↗ |
| 2025-10-20 | Plumbing | 2009 E 8TH ST | Replace sewer yard line | Final ↗ |
| 2025-10-14 | Plumbing | 11904 MUSTANG CHASE | Perform a 42 foot tunnel job with two access holes located on the east side of the home in the side yard. When performing the camera job I a | Final ↗ |
| 2025-10-08 | Plumbing | 800 EMBASSY DR UNIT 328 | Replacement of an existing water heater Replace water heater | Final ↗ |