Austin › contractor
Calixto Plumbing
76 permits on record in Austin (2025-09-03 → 2026-10-22)
Rank in Austin
| Plumbing | #37 of 267 (30 days, 5 permits) | #32 of 959 (12 months, 72) |
Permits per month, last 12 months
Recent permits
| Issued | Trade | Address | Work | Status |
|---|---|---|---|---|
| 2026-10-22 | Plumbing | 4108 CIRCLETREE LOOP | Tunnel under foundation to replace 120 feet of cast iron for 3 full bathrooms kitchen and washer drain. There will be 2 access holes one in | Active ↗ |
| 2026-10-20 | Plumbing | 2604 CAVILEER AVE | Replace sewer line from the home to the city tap connection total length of sewer line is approximately 55 feet and will cross uner driveway | Active ↗ |
| 2026-10-15 | Plumbing | 5810 GATESHEAD DR | Tunnel under foundation to remove cast iron drain lines for 2 full bathrooms kitchen and washer. Drain line approx. 70 ft. Two access holes: | Final ↗ |
| 2026-10-14 | Plumbing | 1007 PAYNE AVE | Replace sewer line from home to city tap connection. Total length of sewer line approximately 55 feet. | Final ↗ |
| 2026-10-14 | Plumbing | 7708 TISDALE DR | Tunnel under foundation to replace cast iron drain lines for 1 full bathroom with kitchen and washer. Total of 2 access holes one in the bac | Active ↗ |
| 2026-09-23 | Plumbing | 2501 DOUGLAS ST | Replace main sewer line from the home to the city tap connection total length of sewer line is approximately 53 feet long. | Final ↗ |
| 2026-09-22 | Plumbing | 2602 CAVILEER AVE | Replace water line from meter to the home a total of 40 feet. Replace water lines under the foundation of pier and beam home for 2 full bath | Final ↗ |
| 2026-09-15 | Plumbing | 5609 WESTMINSTER DR | Tunnel under foundation to replace cast iron drain lines for one full bathroom kitchen and washer drains only. 3 access holes will be made o | Final ↗ |
| 2026-09-15 | Plumbing | 5904 SPARTAN CV | Create a access hole by the hall bathroom 2 foot by 2 foot hole will be made and tunnel under 12 to 15 feet to correct fall on the main drai | Final ↗ |
| 2026-09-08 | Plumbing | 10600 HARD ROCK RD | Repipe main water line from the home to the city tap connection repipe -interior as well | Final ↗ |
| 2026-09-07 | Plumbing | 3019 E 13TH ST | Repipe main water line from the meter to the home approximate length is 25 feet. | Final ↗ |
| 2026-09-03 | Plumbing | 4006 NORTH HILLS DR | Tunnel under foundation to replace cast iron drain lines for primary bathroom and hall bathroom only. Two access holes: one on right side of | Final ↗ |
| 2026-09-01 | Plumbing | 3135 EANES CIR | Interior (only) renovation of a 1980 built residential home in BeeCave Woods. Renovation includes modification upgrades to the original inte | Active ↗ |
| 2026-08-31 | Plumbing | 4214 FAR WEST BLVD | ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [4bed 2bath] Work to include: First floor | Active ↗ |
| 2026-08-31 | Plumbing | 5601 S OAK BLVD | Repipe drain lines for 2 full bathrooms kitchen and washer under pier and beam foundation total length of drain line is approximately 40 fee | Final ↗ |
| 2026-08-18 | Plumbing | 1508 ELTON LN | Replace galvanized water lines for one full bathroom kitchen and washer u Der pier and beam home. Water lines will be replaced with pex mate | Final ↗ |
| 2026-08-06 | Plumbing | 5115 CREEKLINE DR | Tunnel under foundation to replace cast irons drain lines for 2 full bathrooms kitchen and washer drain line. Total length of tunnel is appr | Final ↗ |
| 2026-07-29 | Plumbing | 4107 CIRCLETREE LOOP | Tunnel under foundation to replace cast iron drain lines for 2 full bathrooms a half bathroom kitchen and washer drain line. approximately 1 | Active ↗ |
| 2026-07-22 | Plumbing | 2205 LARAMIE TRL | Tunnel under foundation to replace cast iron drains for primary bathroom 1/2 bathroom and kitchen with washer drain line as well. Total leng | Final ↗ |
| 2026-07-16 | Plumbing | 3009 VAL DR | Sewer line replacement from the home to the city tap connection. Total length of sewer line is approximately 80 feet long | Final ↗ |
| 2026-07-15 | Plumbing | 4700 CAT MOUNTAIN DR | ePlan: Residential Expedited Review - Addition and Remodel to Existing Single Family Res. work to include interior remodel vault kitchen cei | Active ↗ |
| 2026-07-14 | Plumbing | 4208 NORTH HILLS DR | Replace sewer line from the home to the city tap connection total length of sewer line is approximately 40 feet. | Final ↗ |
| 2026-07-09 | Plumbing | 2302 WHITESTONE DR | Tunnel under foundation to replace cast iron drain lines for 2 full bathrooms kitchen and washer drain lines. 2 access holes will be made on | Final ↗ |
| 2026-07-08 | Plumbing | 1519 W 29TH ST | Replace sewer line from the home to the city tap connection total length of sewer line is approximately 55 feet. | Final ↗ |
| 2026-07-03 | Plumbing | 1410 KAMAR DR | Tunnel under foundation to replace cast iron drain lines for one full bathroom kitchen and washer drain line. Kitchen and washer drain line | Final ↗ |