Air Craft Inc. Air Conditioning, Refrige
52 permits on record in Austin (2025-09-25 → 2026-10-16)
Rank in Austin
| HVAC & Mechanical | #23 of 194 (30 days, 7 permits) | #39 of 825 (12 months, 47) |
Permits per month, last 12 months
Recent permits
| Issued | Trade | Address | Work | Status |
|---|---|---|---|---|
| 2026-10-16 | HVAC & Mechanical | 500 PAMPA DR | Interior Renovation to accommodate Temporary Offices | Active ↗ |
| 2026-10-02 | HVAC & Mechanical | 835 W 6TH ST UNIT 1000 | Interior Remodel - Game Testing Coffee Bar and Game Observation Room. | Active ↗ |
| 2026-10-02 | HVAC & Mechanical | 835 W 6TH ST UNIT 1000 | Interior Remodel - The Unisex Restroom will remain available while the Men & Ladies Room are under construction. Once they are completed the | Active ↗ |
| 2026-10-02 | HVAC & Mechanical | 835 W 6TH ST UNIT 1000 | Interior Remodel - 2 Conference Room Parents Lounge Reception Townhall Break Out Area and Open Office Areas. | Active ↗ |
| 2026-10-02 | HVAC & Mechanical | 835 W 6TH ST UNIT 1100 | Interior Remodel - Restrooms - The Unisex Restroom will remain available while the Men & Ladies Room are under Construction. Once they are c | Active ↗ |
| 2026-10-02 | HVAC & Mechanical | 835 W 6TH ST UNIT 1100 | Interior Remodel - Office Area Open Office Areas and Breakout Area. | Active ↗ |
| 2026-10-01 | HVAC & Mechanical | 11400 N MOPAC EXPY SVRD SB | CHANGE OF USE CHURCH TO PRIVATE SCHOOL-conversion of existing Christian life center to become middle school | Active ↗ |
| 2026-09-16 | HVAC & Mechanical | 5920 W WILLIAM CANNON DR BLDG 1 UNIT 100 | Interior renovation of existing office space B occupancy. Removal of existing wall partitions doors frames. Removal of existing ceiling tile | Active ↗ |
| 2026-08-28 | HVAC & Mechanical | 6200 BRIDGE POINT PKWY BLDG 4 UNIT 300 | INTERIOR REMODEL new finishes ceilings and lighting and the building out of new office space | Final ↗ |
| 2026-08-25 | HVAC & Mechanical | 2020 W ANDERSON LN UNIT 100 | Replacement of any self-contained packaged units Replacement of 1x 7.5-Ton RTU and 1x 10-Ton RTU (Like for like systems) at Four Hands Outle | Active ↗ |
| 2026-08-25 | HVAC & Mechanical | 4401 FREIDRICH LN BLDG 4 | Replacement of any self-contained packaged units Replacement of 1x like-for-like 7.5 Ton RTU | Active ↗ |
| 2026-08-05 | HVAC & Mechanical | 11110 METRIC BLVD UNIT E | Replacement of any self-contained packaged units Replacement of 2x 12.5 Ton RTUs (Like for like no curb adaptors) at Apparent Technologies. | Active ↗ |
| 2026-08-04 | HVAC & Mechanical | 601 W BRAKER LN BLDG 1 | Change of Use from Religious Assembly to Admin/Bus Office with minor interior remodel. 2026-012346 DA | Final ↗ |
| 2026-07-09 | HVAC & Mechanical | 11525 STONEHOLLOW DR UNIT 125 | Replacement of any self-contained packaged units Replacement of (1) like-for-like 3-Ton RTU at Build A Sign. | Active ↗ |
| 2026-06-18 | HVAC & Mechanical | 1835 KRAMER LN BLDG A UNIT 100 | Replacement of any self-contained packaged units Replacement of 1x 7.5 Ton RTU at 1835A Kramer Lane Suite 100. This is not a duplicate permi | Final ↗ |
| 2026-06-18 | HVAC & Mechanical | 12617 RIDGELINE BLVD BLDG C | Replacement of any self-contained packaged units Replacement of 2x like-for-like Lennox 7.5 Ton rooftop units at Champion Performance. | Active ↗ |
| 2026-06-18 | HVAC & Mechanical | 4616 W HOWARD LN BLDG 5 UNIT 550 | Replacement of any self-contained packaged units Replacement of 1x like-for-like 17.5-Ton RTU. | Active ↗ |
| 2026-05-26 | HVAC & Mechanical | 3201 WINDSOR RD | Replacement of any self-contained packaged units Replacement of 5x like-for-like rooftop units. The units are 2x 3-Tons 2x 5-Tons and 1x 7.5 | Final ↗ |
| 2026-04-15 | HVAC & Mechanical | 2401 PEARL ST | Interior renovation to the existing kitchen serving the residential facility along with the replacement of the grease interceptor. Scope inc | Final ↗ |
| 2026-03-17 | HVAC & Mechanical | 10025 ALTERRA PKWY UNIT 100 | Initial tenant improvement of first-level suite to create B occupancy office space with meeting rooms employee break room and open office. | Final ↗ |
| 2026-02-17 | HVAC & Mechanical | 1514 ED BLUESTEIN BLVD SB UNIT 101 | Replacement of any self-contained packaged units only (like for like) | Final ↗ |
| 2026-02-03 | HVAC & Mechanical | 10025 ALTERRA PKWY UNIT 1500 | First Time Finish-Out for Admin Office - Suite 1500 | Final ↗ |
| 2026-01-21 | HVAC & Mechanical | 7301 METRO CENTER DR BLDG 15 UNIT 150 | ePlan: Commercial Expedited Review- First Time Finish out from Warehouse Shell to Office Warehouse (41770 SF) | Final ↗ |
| 2026-01-12 | HVAC & Mechanical | 8200 CAMERON RD UNIT 162 | Replacement of any self-contained packaged units Replacement of 1x Split System for Rotech Health Care. | Final ↗ |
| 2025-12-19 | HVAC & Mechanical | 10500 N IH 35 SVRD SB BLDG A | Change of Use of an existing 2 story 13337sq ft warehouse to a 2853 sq ft commercial Office and 10484 sq ft open parking. | Final ↗ |