Austin › contractor
Accurate Leak & Line
228 permits on record in Austin (2025-09-03 → 2026-10-21)
Rank in Austin
| Plumbing | #15 of 267 (30 days, 10 permits) | #11 of 959 (12 months, 192) |
Permits per month, last 12 months
Recent permits
| Issued | Trade | Address | Work | Status |
|---|---|---|---|---|
| 2026-10-21 | Plumbing | 11500 BUTTONWOOD DR | 10 tunnel below the foundation to spot repair the main. 1 access hole - front/right | Active ↗ |
| 2026-10-21 | Plumbing | 5406 FAIRMONT CIR | 50 tunnel below the foundation to replace entire drain system. 2 access holes - front right | Active ↗ |
| 2026-10-21 | Plumbing | 2706 GERAGHTY AVE | 55 tunnel below the foundation to replace entire drain system. 3 access holes - right left front | Active ↗ |
| 2026-10-14 | Plumbing | 1716 SHELBOURNE DR | 65 tunnel below the foundation to replace entire drain system. 2 access holes - front left | Active ↗ |
| 2026-10-09 | Plumbing | 9219 E HUNTERS TRCE | 75 trench to replace yard sewer | Final ↗ |
| 2026-10-08 | Plumbing | 9303 MOSSWOOD CIR | 108 tunnel below the foundation to replace the entire drain system. 3 access holes - right front left | Final ↗ |
| 2026-10-05 | Plumbing | 2902 DOVER PL | 80 tunnel below the foundation to replace entire drain system. 3 access holes - front right left | Final ↗ |
| 2026-10-05 | Plumbing | 1609 MEARNS MEADOW BLVD | 10 tunnel below the foundation to repair the main drain line. 1 access hole in front | Final ↗ |
| 2026-09-30 | Plumbing | 6506 WILLAMETTE DR | 95 tunnel below the foundation to replace entire drain system. 3 access holes - front right left | Active ↗ |
| 2026-09-29 | Plumbing | 5602 DELWOOD DR | 65 trench to replace yard sewer | Final ↗ |
| 2026-09-24 | Plumbing | 5607 BERKMAN DR | 90 tunnel below the foundation to replace the entire drain system. 3 access holes - front. right left | Final ↗ |
| 2026-09-22 | Plumbing | 3606 QUIETTE DR | 40 tunnel below the foundation to replace the main drain and master bath drain lines. 2 access holes - front right | Active ↗ |
| 2026-09-21 | Plumbing | 4202 FARHILLS DR | 125 tunnel below the foundation to replace entire drain system. 4 access holes - front right right left | Final ↗ |
| 2026-09-21 | Plumbing | 2605 WESTOVER RD | 65 trench to repair the yard sewer line. 10 tunnel below the foundation to repair the master bath drain line. 1 access hole - front | Final ↗ |
| 2026-09-15 | Plumbing | 5430 FAIRMONT CIR | 65 tunnel below the foundation to replace the drain lines for kitchen and utility. 2 access holes - front right | Active ↗ |
| 2026-09-14 | Plumbing | 4808 AVENUE F | trench to replace yard sewer and 15 tunnel below the foundation to replace cast iron master bath and kitchen drain lines. access hole - fron | Active ↗ |
| 2026-09-10 | Plumbing | 6413 CARY DR | 75 tunnel below the foundation to replace entire drain system and 35 trench to reroute sewer from left side of home to city tap near side st | Active ↗ |
| 2026-09-09 | Plumbing | 11135 CALLANISH PARK DR | 6 tunnel below the foundation to repair break on 4x2 wye with root intrusion on main. 1 access hole left side at clean out 5 tunnel below th | Active ↗ |
| 2026-09-09 | Plumbing | 2504 AUDUBON PL | 65 tunnel below the foundation to repair breaks under master bathroom drain lines for both units and correct slope on the main.2 access hole | Active ↗ |
| 2026-09-09 | Plumbing | 5204 EMERALD FOREST DR | 40 trench to replace yard sewer | Active ↗ |
| 2026-09-09 | Plumbing | 16532 FETCHING AVE | 124 tunnel below the foundation to replace entire PVC drain system. 3 access holes - right front left | Active ↗ |
| 2026-09-09 | Plumbing | 11504 BRUCE JENNER LN | 15 tunnel to repair breaks on the main drain line. 1 access hole - front | Active ↗ |
| 2026-09-02 | Plumbing | 5803 NORTH HAMPTON DR | 50 trench to replace yard sewer | Active ↗ |
| 2026-08-28 | Plumbing | 1404 CLOVERLEAF DR | 45 trench to replace yard sewer. 40 tunnel below the foundation to replace remaining cast-iron drain system. 2 access holes - right front | Active ↗ |
| 2026-08-27 | Plumbing | 6304 BERKELEY CV | 100 trench to replace yard sewer and 10 tunnel below the foundation to correct slope on the main drain. 1 access hole in front | Final ↗ |